Case Study: High-Precision Extrusion Line Modernization
Increasing Production Efficiency and Reducing Scrap for a Major European Cable Producer


1. Project Overview & Background
When off-the-shelf equipment cannot meet your complex production requirements, our R&D and manufacturing teams step in. We design, engineer, and build bespoke cable and wire machinery strictly aligned with your specific operational goals. From the first 3D CAD model to final on-site commissioning, we deliver robust, high-performance mechanical assets built to withstand the most demanding industrial environments.
The Client:
A leading cable manufacturer in Europe specializing in high-voltage industrial cables.
The Asset:
A 15-year-old, large-scale extrusion line that was the backbone of their facility but had become an operational bottleneck.
Objective:
To restore precision, increase line speed, and integrate the system into the factory’s central data network.
2. The Challenge: Legacy Limitations
Before Bemos Automation’s intervention, the client faced several critical challenges that threatened their market competitiveness:
Inconsistent Quality:
The aging DC drive system struggled with tension control, leading to irregular insulation thickness and frequent product rejections.
High Material Waste:
A staggering 12% scrap rate was recorded due to startup instabilities and synchronization errors.
Maintenance Nightmare:
Obsolete electrical components made it nearly impossible to find spare parts, leading to unplanned downtime that lasted days.
Lack of Data:
There was no real-time monitoring; management could only see production results at the end of the shift, making it impossible to react to live errors.
3. Our Engineering Approach: The Solution
Our team executed a multi-phase “Total Line Revitalization” strategy:
Phase A: Mechanical Restoration & Power Upgrade
Phase B: Intelligent Control & Automation
Phase C: Safety & Compliance
4. Technical Specifications

5. The Results: Measurable ROI
0
Increase in Line Speed:
0
Scrap Reduction:
0
Zero Unplanned Downtime:
0
Month Payback Period:
6. Client Testimonial
“Bemos Automation didn’t just repair our machine; they re-engineered it for the 21st century. The level of precision we now achieve with our 15-year-old line is comparable to a brand-new multi-million dollar installation.” — Production Director, European Cable Group
Is Your Production Line Reaching Its Limits?
Don’t settle for declining efficiency. Our engineers are ready to perform a technical audit of your legacy machinery and propose a roadmap for modernization.